1) How to interpret stock arrival schedule? Suppose we command a division, standard stock level is said to be 7 days. So if supply arrival is 20% for Day 1, does that mean we will receive 1.4 day supply for a division on Day 1, or 0.2 day supply?

2) How to interpret stock numbers for a base? For example, a regiment base depot tab shows ammo stock 62/89, does 89 mean ton, and indicates the standard stock level, in this case, 4 days?
 

simovitch

Member
Joined
Nov 15, 2014
Messages
658
Points
28
Age
63
Location
California, USA
1. It means roughly 20% of the supply needs of your entire force will arrive that day at your SEP's.
2. It means it has 62 out of the 89 tonnes needed to reach 100% levels by all the requesting units. A Company requests 2 days, but a Brigade is hoping for 4 days supply stock so these are factored in.
 

SamuraiN

Member
Joined
Oct 24, 2019
Messages
58
Points
8
Age
30
Location
Global
1. It means roughly 20% of the supply needs of your entire force will arrive that day at your SEP's.
2. It means it has 62 out of the 89 tonnes needed to reach 100% levels by all the requesting units. A Company requests 2 days, but a Brigade is hoping for 4 days supply stock so these are factored in.

Thanks a lot!
 
Top